Control and automation
Schneider Indication lamps will be used “Green light to show running and red light to show fault if a drive is Isolated or tripped out”.
Schneider push buttons” start & stop all system” and emergency stop will be used.
Relays will be used
Power supply 24 VDC should be existed to supply the control system.
Legrand Terminal fuse will be used in the control circuits “24 VDC”.
Siemens, Delta and Allen Bradley PLC will be used, If the project requires
Linking the control system to the SCADA system to facilitate the remote control and monitoring process
The possibility of developing the control process to become wireless and the possibility of controlling it via the Internet
Adding an interactive HMI screen on the control panel to facilitate the operator’s handling and control of transmission lines
Developing the infrastructure of the existing control systems in the old production lines and replacing them with advanced and modern ones